Home /

DIN Rail Mounting PLC Power Meter Box , Keypad Split Electric Meter Box Replacement

DIN Rail Mounting PLC Power Meter Box , Keypad Split Electric Meter Box Replacement

Brand Name:Radarking
Certification:IEC
Model Number:Radarking-E4
Minimum Order Quantity:1
Delivery Time:30 days
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Wuhan Hubei China
Address: No.270, Huangjinkou 3rd Village, Hanyang District, Wuhan City, Hubei Province, China
Supplier`s last login times: within 1 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

PLC Automatic Meter Reading System DIN Rail Mounting Keypad Split Energy Meter Box


1. General Descriptions

Model DIN-BOX-168 box (hereafter referred as Tbox) is a multifunction metering solution composed of meter Box,Measurement & Control Unit (MCU), Data Concentrator (DC) and User Interface Unit (UIU). Each Tbox can access the farend servers via GPRS, so that the administrators can remotely operate Tboxes and read all the meters' energy consumption information. It can help utility companies to largely improve the management efficiency of their power grids, and reduce the management cost. For users, UIUs installed in their homes could achieve energy consumption data from box via RS485communication, and display to users, so that it is not only convenient for them to read data, but also avoid disruption of energy measurement. Thus, this is a complete metering box solution which combines measurement, use and management of energy.


The box is composed of PC (polycarbonate) cover and ABS base, with performance of reliable insulation, high strength, good flaming resistance, anticorrosion, antiaging and lifetime of over 10 years. It could be widely used in housing construction or civil power grids transformation, with features of multiple combinations of different metering units, easy installation, hidden cableconnection and safe operation.


2. Main Parameters


No.ItemInstructions

1

Current
Total threephase maximum current: 256A. Max current of one singlephase meter: 80A.





2




Connection
Cables
1) In the three phases, phases A, B & C respectively use yellow, green and red connectioncable, the neutral line uses black or blue cable, and the ground line uses yellow and greencable.
2) The cables for internal meters shall be at least BV16mm2 cooper cables.
3) The communication cables should be coppercore twistedpair cables with cross section no less than 0.7mm2.
4) The general cable for each phase shall be copper cable of at least BV50mm2.






3




Meter box with PCcover and ABS base.
1) Tensile strength: ≥35Mpa
2) Bending strength: ≥65Mpa
3) Distortion temperature: ≥100ºC
4) Flame retardant rating: V0
5) Dielectric strength: ≥12 KV/mm
6) Impact strength: Charpy impact strength≥20kJ/m2
7) Sealing performance: With the performance of waterproof, dustproof and prevent thesmall animal into the meter box.



4


Temperature
1) Maximum temperature: 55ºC (Average temperature ≤35ºC within 24 hours)
2) Average temperature of the hottest month: 35ºC
3) Minimum temperature:10ºC
5AltitudeAltitude: ≤2000m


6



Humidity
1) Daily average relative humidity ≤ 95%
2) Daily average water vapor pressure ≤ 2.2kpa
3) Monthly average relative humidity ≤ 90%
4) Monthly average water vapor pressure ≤ 1.8kPa
7LifetimeThe expected life time of meter box ≥ 20years
8Class of pollution≤ Class 2



3. Operation Principles
A single set of meter box is made of 1 Box, 12 MCUs, 1 DC and 12 UIUs. The box supplies power to the MCUs, DC and UIUs. The MCUs are used for energy measurement, the UIUs for display of energy and electrical parameters, while the DC for reading & transmitting data from MCUs and communicating with the Server. Communication between MCUs and DC is by RS485, between UIUs and DC is by RS485, while between DC and Master Station System is by GPRS.


When the administrators need to read the meter data, below steps should be taken:
1) The administrators send data reading command from the browser interface;
2) The Server will receive the command and send to the DC via GPRS communication;
3) The DC transmits the command to the MCUs and collects the data;
4) The DC sends the data to the browser interface;
5) The data will be saved in the database during this process.


Users can input some codes on the UIUs' keyboards to check and view their energy consumption data. The displayed data arestored in the UIUs, and the DC will keep sending and upgrading the latest energy consumption data to the UIUs.


4. Installation Size


3. Components & Parameters


3.1. List of Components


Table 3.1 List of Components



No.


Model


Name of Components


Application


1


Tecun DDSY168

Singlephase Twowire

Meter (MCU)


Measurement

2Meter Holding RackTo hold the MCUs firmly.
3Tecun DC01Data ConcentratorData collection
4Locking deviceTo lock the meter box
5RS485 Connection BlockTo provide RS485 communication ports to UIUs
6Cover Opening DetectorTo detect the opening of meter box cover
7Output TerminalsTo output power to the users' homes

8


Vertical Installation Bars

To be installed vertically in the backside of meter box, for fixing the meter box onto the pole or wall.

9

Horizontal Installation

Bars

To be installed horizontally in the backside of meter box, for fixing the meter box onto the pole.

10


Hoop

To be installed in the backside of meter box, used for fixing the meter box onto the pole.
11Input TerminalsTo input power from threephase power grid.

12


Neutral Line Terminals

Threephase input neutral line terminals and output neutralline terminals.

13


Cable Fixer

To fix the cables, avoid cables' shaking and preventwater dropping into box from cable entrances.

14


Tecun DDSY168


User Interface Unit (UIU)

To be installed in user's homes for users to check the energyconsumption information.


China DIN Rail Mounting PLC Power Meter Box , Keypad Split Electric Meter Box Replacement supplier

DIN Rail Mounting PLC Power Meter Box , Keypad Split Electric Meter Box Replacement

Inquiry Cart 0