Home /Vacuum Equipment /

Connect Flange Forged Steel Flanges Petroleum Pipeline Flange ASTM 6

Connect Flange Forged Steel Flanges Petroleum Pipeline Flange ASTM 6

Brand Name:HUIXUAN
Certification:ISO9001:2008,BV,SGS,IST,UL.CTI
Model Number:flange
Minimum Order Quantity:1 piece
Delivery Time:30-50 days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Address: A 509,HuaJian Mansion,Zhangjiagang City,JiangSu Province,China
Supplier`s last login times: within 26 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Connect Flange Forged Steel Flanges Petroleum Pipeline Flange ASTM 6


Reference

MaterialA105,16Mn
Equipment3150T hydropress
Apply

Weld flange of petroleum pipe line

Melting processLF+EF+VD
Production process

Forging+heat treatment+rough machine+finish machine

Ratio≥3
Applicable certificateASTM,ASME,DIN,JIS,ISO,BS,API,EN
Executive standardJB/GB/EN/DIN/JIS/ASME/ASTM/ISO

Certificate authority

ISO,BV,SGS, IST, UL,CTI
Delivery term

Rough machine(N+T);finish machine(Q+T)


Test equipment


Spectrograph,UT device,tensile and impact test machine,metalloscope,hardness test machine


Service

Our service included the forging, process, heat treatment, finish machining, package, local logistics, customers clearance and maritime transport. We took the customer’s requirements as the principal thing, and pay attention on the products quality.

Custom property

ElementsCSiMnPSCrNiMo
16MNn0.13-0.200.17-0.371.20-1.60≤0.030≤0.030≤0.30≤0.30--


Mechanical property


Dia.(mm)


TS/Rm(Mpa)


YS/Rp0.2(Mpa)


EL/A5(%)


RA/Z(%)


Type Of notch


Impact energy


HBW

16MnØ15470-630≥345≥21--V-20℃≥34==

Max weight20T
MOQ1PC
Ex-works date20-50 days
PackageWooden case,steel frame
Deliver termsFOB;CIF;CFR;DDU;
PaymentT/T,LC
TransportationAir,ocean

Process procedure:

Forging process flow quality control: Raw material steel ingot into warehouse(test the chemical content) → Cutting→ Heating(Furnace temperture test) → Heat treatment after forging(Furnace temperture test) Discharge the furnace(blank inspection)→ Machining→ Inspection(UT,MT,Visal diamention, hardness)→ QT→ Inspection(UT, mechanical properties, hardness, grain size)→ Finish machining→ Inspection (dimension)→ Packing and Marking(steel stamp, mark)→ Storage Shipment

  1. High-precision dimensional tolerance;
  2. Excellent mechanical properties;
  3. Produce different dimension based on customer’s requirements;
  4. Advanced manufacture equipments and inspection devices;
  5. Excellent technical personality;
  6. Control the production procedure strictly;
  7. Pay attention on the package protection;
  8. Quality full service.

China Connect Flange Forged Steel Flanges Petroleum Pipeline Flange ASTM 6 supplier

Connect Flange Forged Steel Flanges Petroleum Pipeline Flange ASTM 6

Inquiry Cart 0