Home /Electronic & Instrument Enclosures /

Galvanized Steel Outdoor Telecom Cabinet Heat Exchanger Cooling 19”Equipment Rack

Galvanized Steel Outdoor Telecom Cabinet Heat Exchanger Cooling 19”Equipment Rack

Brand Name:ESTEL
Certification:ISO9001, CE, 3C, FCC, TLC, IP55
Model Number:131070608050002
Minimum Order Quantity:1 set
Delivery Time:15-20 working days
Payment Terms:T/T, L/C,D/A, Western Union, Paypal, etc
Contact Now

Add to Cart

Verified Supplier
Location: Shenzhen Guangdong China
Address: Shenzhen, China
Supplier`s last login times: within 35 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Heat Exchanger Cooling Galvanized Steel Outdoor Telecom Cabinet Including 19” Equipment Rack


1. Cabinet Application


(1) 4G system

(2) Communication/network integrated service

(3) Access/transmission switching station

(4) Emergency communication/transmission

(5) Suitable for outdoor environment, such as roadside, park, remote mountain area, building roof.


2. Technical Parameters


ItemTypeTechnical Parameter
StructureDimensioW×D×H 650×600×800mm
LayoutOne compartment, used for installing 19” equipment
Equipment Installation Method19” rack
DoorWith one front door, and anti-theft three point lock for outdoor cabinet (support padlock)
MaterialGalvanized steel, double wall with thermal insulation
StructureAssembled
Ingress ProtectionIP55
Temperature ControlCoolingDC48V heat exchanger
LightingLED lamp48V LED lamps (immovable), with protective circuit breaker
TemperatureTemperatureWorking Temperature: -40°C ~ +55°C
Storage Temperature: -50°C ~ + 70°C
Transport Temperature: -50°C ~ +70°C
HumidityRelative Humidity5% ~ 100%
PressureAir Pressure62kpa ~ 101kpa (similar to 0m ~ 5000m altitude)
Radiation IntensitySolar Radiation Intensity1120 × (1±5%) W/m2
Surface treatmentSurface treatmentDegreasing, derusting, rustproof phosphating (or galvanizing), powder coated.

3. Cable inlet


Cabie Inlet is installed at the bottom.



4. Grounding Bar


(1) The cabinet includes grounding copper bar with anti-corrosion coating. There are enough screws for wiring connection terminals.

(2) The metal part of the cabinet should be interconnected and be connected with grounding bar. Connection resistance between any two points is lower than 0.1Ω.

(3) Protective earthing of other equipments inside the cabinet should be connected to the grounding bar.



5. Lock Theft Proof Design


(1) Damage resistance of the theft proof lock meets GA/T 73-1994 “Mechanical Anti-theft Lock” class B requirement, supporting padlock.


(2) Three point lock


6.Internal Racks



7. Delivery Time


Usually about 10-15 days. The exact lead time need to be confirmed according to the quantity of order.


China Galvanized Steel Outdoor Telecom Cabinet Heat Exchanger Cooling 19”Equipment Rack supplier

Galvanized Steel Outdoor Telecom Cabinet Heat Exchanger Cooling 19”Equipment Rack

Inquiry Cart 0