Home /Pharmaceutical Machinery /

Water Based Drilling Mud System with 2 Screw Pumps Electric Control

Water Based Drilling Mud System with 2 Screw Pumps Electric Control

Brand Name:TR Solids Control
Certification:API Certificate, ISO Certified
Model Number:TRDWM
Minimum Order Quantity:1 Set
Delivery Time:30 days after receiving 30% deposit
Payment Terms:T/T, L/C, D/A, D/P, Western Union
Contact Now

Add to Cart

Verified Supplier
Address: No.10 West of North Second Rig, Weiyang District, Xi’an City, China
Supplier`s last login times: within 48 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Water Based Drilling Mud System with 2 Screw Pumps Electric Control

Product Introduction

Drilling waste mud is one of the major pollution sources in the oil and gas industry. Due to the engineering requirements, oil drilling mud is mixed with oil, water and organic clay etc. In order to meet the customer's requirements and environmental protection, TR Solids Control has developed drilling waste management(Mud non-landing system) with our own intellectual property rights. This system is used to treat waste drilling fluids by matched with drilling processing equipment and applicable pharmaceutical formulations. It ensures that waste slurry doesn’t land for harmless treatment, and solves the issue successfully that drilling waste can not be treated efficiently and environmentally friendly.


Our TR drilling waste management is composed of drying shale shaker, vertical cutting dryer, decanter centrifuge, screw conveyor, slurry sand pump, centrifuge slurry pump (submersible slurry pump or screw pump), mud agitator, mud storage tank and other equipment.

Befits of TR Drilling Waste Management

  1. Reduce the drilling waste quantity to save money on the disposal or further treatment.
  2. For oil based drilling cuttings, normally it can reduce the oil on the cuttings to 3% to 5%.
  3. For water based drilling cuttings, normally it can reduce the moisture content for easy transportation.
  4. Recycling drilling fluids for reuse to save cost.

Technical Parametersof Our Drilling Waste Management

S/NS/NDescription
1Vertical Cuttings DryerTRCD930 with option for VFD or fixed speed
2Decanter CentrifugeTRGLW355Centrifuge 14inch bowl,Optional model as below:
TRGLW355 Centrifuge with VFD drive.
TRGLW355 standard with fixed speed
3Screw PumpTwo sets TRG30A-075 Screw Pump with capacity:30m³/h for each pump.
One for taking fluids from catching tank to feed the decanter centrifuge,the other for flushing the Vertical dryer.
4Skid with catching tankFast move skid for mounting all the equipment
One Catching tank with capacity:4m³ for catching fluid from vertical cuttings dryer.
5Telescopic SkidTwo telescopic skid with walkways and handrails for safe operation.
One for mounting the decanter centrifuge to a higher position in order to allow the centrifuge discharged fluids feed to active mud system by gravity.
The other telescopic skid for mounting and adjusting the height of the vertical cutting dryer to allow the discharge of drying cuttings
6Electric Cradle0.5 Tons electric cradle for lifting the components of vertical dryer
7Electric Control SystemTwo lighting system,electrical control boxes and cables and plugs for operation the complete system.


Competitive Advantages


1. We offer high quality products at competitive price.
2. Shortest delivery time.
3. Flexible payment terms.
4. Timely after-sale service.
5. Most of our equipment can be replaceable with international brands.
6. Our products have been exported to Argentina, Egypt, US, Australia, Romania, Pakistan, Dubai, Abu Dhabi, Iran, India, Indonesia, Vietnam, Malaysia and many other countries.


Company Tenet
Customer's satisfaction is the highest pursuit of TR Solids Control.


China Water Based Drilling Mud System with 2 Screw Pumps Electric Control supplier

Water Based Drilling Mud System with 2 Screw Pumps Electric Control

Inquiry Cart 0