Home /Testing Equipment /

Intelligent Forced Air Cooling Medium Voltage Load Bank For Generator Testing

Intelligent Forced Air Cooling Medium Voltage Load Bank For Generator Testing

Brand Name:KAIXIANG
Certification:ISO9001
Model Number:AC20-2200KW
Minimum Order Quantity:ONE SET
Delivery Time:ONE MONTH AFTER GET DEPOSIT
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram,
Contact Now

Add to Cart

Active Member
Location: Shijiazhuang Hebei China
Address: No33 Wangshan Road, Green Island Economic Development Zone, Shijiazhuang, China
Supplier`s last login times: within 1 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Intelligent Forced Air Cooling 2MW Load Bank For Generator Testing


Product Description


load banks are devices which contain resistive,inductive and/or capacitive loads,apply the load to an electrical power source and dissipate the power of the electrical source .unlike the on-site loads which are randomly variable in terms of many electrical parameters ,load banks provide predetermines and controllable load which serves power source usings energy output to test,support or protect the power source


Technical Parameters


Rating Voltage/Frequency20kV/50Hz, 3 phase 3 wire
Rated power2000kw
Load Resolution400KW.800KW.800KW
PF(Power Factor)1
Load Tolerance (each step)±5%
Load Tolerance(overall)±3%
Display Precision0.5 class
Control Power380VAC/50Hz,
WeightAbout 15000kgs/set
Wire Connection

Load power supply input——Copper bar (star coupling)

Control power supply input——Connector-bar

Size9150*2438*2591mm

Technology Advantages

The system is a self-developed device used for electricity load testing by Kaixiang Technology. It perfectly combines the dry type load module and measurement and control module, precisely test output power and load performance of kinds of generator set, UPS etc.


Application


KX Load Banks can be used to satisfy the requirements for emergency stand-by power systems. These requirements concern acceptance testing and periodic on-site testing and maintenance of emergency and stand-by power systems. The essence of the requirements is that emergency and stand-by power systems are to be tested under load.



China Intelligent Forced Air Cooling Medium Voltage Load Bank For Generator Testing supplier

Intelligent Forced Air Cooling Medium Voltage Load Bank For Generator Testing

Inquiry Cart 0