Home /Moulds /

Double Injection Molding Process Plastic Electrical Component Part Provide UG Pro Design

Double Injection Molding Process Plastic Electrical Component Part Provide UG Pro Design

Brand Name:OEM/ODM
Certification:ISO9001
Model Number:HW-178
Minimum Order Quantity:2000 pieces
Delivery Time:25-30days
Place of Origin:China
Contact Now

Add to Cart

Verified Supplier
Location: Dongguan Guangdong China
Address: No.39, HeXing road, ShaTou district, Chang'an town, DongGuan City 523863, China
Supplier`s last login times: within 1 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

2k double shot injection plastic Electric drill casing molding


Mould Information:


Mould materialP20 steel, 718, 2738, H13, NAK80, 2344, 2343, S136, etc .
Mould typeInjection plastic mould
Product materialABS,PA,PA66+GF,POM,PC,PP,PET,TPE,PVC,HDPE,etc
Mould baseHASCO, DME, MISUMI, JIS, LKM, etc.
Mould runnerHot/Cold Runner
Mould tooling equipmentLathe, Milling, Grinder, Drill, CNC, EDM, Wire cut machine, Punch machine
De-mould TypeAutomatic Ejector
Maximum mould size1500*1500 mm
GateSide Gate, Sub Gate, Direct Gate, Hook Gate, Pin Point Gate, etc.
CavitySingle or Multi cavities
Mould Life45#:300,000 to 500,000 shots
P20:600,000 shots
718: 800,000shots
Lead timeAbout 3-4 weeks
PackageWooden packing box or as customer's requirements

1. Company Information:


HOWE specializes in injection molding industries and dedicated to be the well-deserved molder providing the best service to our customers globally.


2. Our Strength and Service:


1) Quick quote response and reasonable price for different MOQ requirements. And one NDA will be followed to warrant the confidentiality of the customers' files and documents received.


2) Internal feasibility study review meeting to cover all the aspects related to the quoting projects will be conducted and one internal feasibility study report along with timing plan and capacity analysis report will be prepared accordingly.


3) The tooling and molding reports will be prepared and provided based on different customers requirements when the new projects are officially nominated and kicked off.

- DFM Study Report

- Mold Flow Analysis Report

- CAD/CAM in real 3D Environment for mold

- Complete mold manufacturing processes tracking report update

- New samples submission and tooling modification loops tracking

- Molding process DOE report and process setting sheet improvement

- FAI/ISIR Reports submission on schedule

- PPAP/Qualification reports submission to customer


4) Professional program management will ensure close communication and frequent update regarding the new projects to our customers through the whole project phases.


5) Good quality control systems and training will help us to deliver high-quality parts to our customers strictly and continuously.


6) Good consolidation for the toolmakers and secondary process suppliers around the Dongguan region will help us to be more competitive in the molding industry.




China Double Injection Molding Process Plastic Electrical Component Part Provide UG Pro Design supplier

Double Injection Molding Process Plastic Electrical Component Part Provide UG Pro Design

Inquiry Cart 0