Add to Cart
GK200 Water Well Drilling Rig Engineering Machinery Without Air
Compressor
Geological Drilling Rig Machine brief introduction
The GK-200 mobile drilling rig is a kind of widely used and
hydraulic feeding drill, which has the characteristics of big
power, great lifting force (2T) and high transmission torque. It
can be used in engineering geological survey of railway,
hydropower, transportation, bridge, foundation and other buildings, geological core drilling and physical exploration and so on.
Drill Rig Specification | |
Drilling depth | 200m |
Drilling Diameter | 75mm,91mm,110mm,130mm,150mm,300mm |
Drilling rod diameter | 50mm |
Drilling Angle | 90°-75° |
Dimensions(L×W×H) | 1750×850×1300 (mm) |
Weight | 1050kg/set |
Swivel Head | |
Spindle Speed | 115, 230, 505, 1010r/min |
Spindle stroke | 450mm |
Spindle Dia. | 65mm (53x59 Kelly) |
Upward displacement speed of drilling vertical spindle | 0.05m/s |
Downward displacement speed of drilling vertical spindle | 0.067m/s |
Spindle pull-down max | 15KN |
Spindle lifting capacity max | 25KN |
Vertical maximum output torque | 1.5KN.m |
Hoist | |
Max. Lifting capacity(single rope) | 20KN.m |
Lifting rotating speed | 20; 40; 90; 168r/min |
Hoisting drum linear velocity (two levels) | 0.17; 0.35; 0.73; 1.5m/s |
Durm Diameter | 140mm |
Wire rope diameter | 9.3mm |
Wire rope capability | 40m |
Gear Pump | |
Model | YBC-12/125 |
Rated pressure | 12.5Mpa |
Displacement | 20ml/r |
Rated Speed | 2000r/min |
Diesel Engine | |
Model | ZS1115 |
Rated Power | 16.2KW |
Rated Speed | 2200r/min |
Mud Pump | |
Model | BW-160 |
Displacement | 38, 58 ,90, 160 L/min |
Pressure | 1.3 Mpa |
How about the features of it ?
1. With hydraulic automaatic feeding device, elevated drilling
efficiency.
2. Large torque and drilling diameter.
3. With a spherial jaw holding mechanism and the rod replacement
without breakdwn, high efficiency.
4. Compact structure, small volume, lightweight, high
detachability, easy transportation and suitable for the operations
in plains or mountain areas.
5. Adoping large drive pipe, double guide rod, increase the
stability.
Well point measurement and positioning → hole digging and casing
embedding → drilling rig in place → drilling → hoisting well pipe →
back-filling filter material (coarse sand or gravel) between well
pipe and hole wall → hole washing → drainage pump in well pipe and
installation of pumping control circuit → trial pumping → normal
operation of well point → de watering completion, pipe pulling →
well sealing.
The de watering shall be carried out 20 days before the excavation
of the foundation pit, so as to drain the stagnant water in the
stratum in advance, reduce the groundwater level, improve the self
stabilization capacity of the soil layer, and smoothly carry out
the anhydrous operation. During the de watering operation, the
water level observation of each well shall be done well, and the
change of the head of the confined aquifer shall be mastered in
time