Add to Cart
PLC Touch Screen 4T/D Fresh Dried Mango Production / Processing Line
The nutritional value of mango;
Mango is one of the famous tropical fruits. Mango fruit contains
sugar, protein and crude fiber. Mango contains a high content of
vitamin A, which is rare in all fruits. Secondly, the vitamin C
content is not low. Minerals, proteins, fats, sugars, etc. are also
the main nutrients. It can be made into juice, jam, canned food,
pickled, hot and sour kimchi and mango milk powder, candied fruit,
etc. Dried fruit is good for stomach, vomiting, and stun.
Therefore, mango is effective for vertigo, Meniere's syndrome, high
blood dizziness, nausea and vomiting. The dried mangoes produced by
the dried mango production line not only retain the flavor of
mango, but also extend the shelf life of mangoes.
Dried mango processing line quality assurance:
1.The motor of Chenfei’s processing machine is basically ABB,
Siemens and Jiangsu Dazhong.
2.Stainless steel is from Zhangjiagang Pohang Stainless Steel Co.,
Ltd. (joint venture)
3.The water pump is from Nanfang and the centrifugal pump is from
Yuanan.
4.Electrical cabinet and PLC control system: Siemens PLC touch
screen, switch and AC contactor electrical protection is Schneider,
intermediate relays are Honeywell.
5.The 304 pipes we use for the pipeline is from Yuan'an, the cables are all good cables.
Dried mango processing line technology advantages:
The preparation method of the dried mango production line
processing production line comprises the following steps:
1. Mango as a raw material;
2. Ripening the mango;
3. Washing the ripened mango;
4. Peeling the mango;
5. Pretreating the peeled mango;
6. The mango after the pretreatment is sliced to obtain a mango
slice;
7. The taste of the mango pieces is coded;
8. Color-protecting the mango pieces after the taste is tasted;
9. Drying the mango pieces after the color protection to obtain
dried mangoes;
10. Softening the dried mango;
11. Packing the dried mangoes after softening.
Mango dry production line equipment list
Raw materials: around 24 tons / DAY
Requires plant area: 5000
Required power: 200KW
Requires water: 100 tons / day
Boiler: 3T
Need workers: about 100 people
Finished product: 4 tons / DAY
Packing: 40 kg / box (wholesale) and 125g zipper packaging
Production line core equipment parameters:
No | Product Name |
A: Pre-processing equipment | |
A1 | Meat Cleaver |
A2 | Hoist |
A3 | Continuous color protection machine |
A4 | keg |
A5 | Vacuum drawing equipment |
A6 | Hoist + Hopper |
A7 | Vacuum immersion sugar unit |
A8 | High speed sugar can |
A9 | Centrifugal pump |
A10 | Mesh belt conveyor |
A11 | Centralized control system |
B: Drying equipment | |
B1 | Hot air drying room |
B2 | Cold air drying room |
B3 | Drying car |
B4 | Tray |
B5 | Nylon mesh |
B6 | Padding |
B7 | Paving workbench |
B8 | Workbench |
C:Packaging equipment | |
C1 | Belt conveyo |
C2 | Z type vibration hoist |
C3 | 10 head combination scale |
C4 | Stainless steel platform |
C5 | Bag packaging machine |
C6 | Conveyor |
Flow chart:
Raw fruit -- ripening -- peeling, splitting -- color protection --
vacuum soaking sugar -- drying -- dehumidification -- picking --
packaging
Question and answer:
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry.If you
are very urgent to get the price, please call us or tell us in your
email so that we will regard your inquiry priority.
2) How do you make your price?
We make the price according to our comprehensive costing. And our
price will lower than the trade company because we are
manufacture.You will get competitive price and better quality.
3) Can you guarantee your quality?
Of course. We are the manufacture factory. More important, we put a
high value on our reputation. Best quality is our principle all the
time. You can be assured on our production completely
4) What about the transportation and delivery date?
We use ship to transprot the goods.It is about 25-40 days.It also
denpends on which coutry and port you are. We can send the goods by
air if there are some emergencies , as long as you afford the
freight.
After sale service
1. Welcome to consult us for offer and technical solution.
2. Workshop layout design is free.
3. Free check raw material quality report to match suit water
treatment system.
4. Engineer installation and train client how to use and maintain
machine.
The company