Home /Other Earthwork Products /

Auger Foundation Pile Drill Rig 360T Piling Capacity Eco - Friendly

Auger Foundation Pile Drill Rig 360T Piling Capacity Eco - Friendly

Brand Name:T-WORKS
Certification:ISO,CE,GOST
Model Number:ZYC360B-B1
Minimum Order Quantity:1 UNIT
Delivery Time:30-45 days
Place of Origin:CHINA
Contact Now

Add to Cart

Verified Supplier
Location: Changsha Hunan China
Address: No,21,Yongyang Road, Liuyang Hi-tech Industrial Development Zone, Changsha, Hunan, China 410323
Supplier`s last login times: within 22 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

ZYC Series Fast Piling Speed Pile Foundation Equipment with 360T piling capacity


1, Description:

ZYC Series Fast Piling Speed Pile Foundation Equipment which is researched and produced independently is one of the Chinese characteristic large model green pile machine for foundation construction. The construction of precast pile entirely depends on the pressure of the hydraulic static pile. It has the characters such as, no vibration, no noise, high efficiency, energy-saving, high piling rate, excellent quality pile. It has been widely used in the engineering construction and also got the great reputation in the field of civil engineering machinery and equipment.


2, Applications:


  • No limitation on pile length. Suitable for construction in clay soil, soft soil and sand bed foundation, or in the Karst areas with low earth covering, or by riversides, or in coastal areas with deep bearing stratum.
  • No noise, No pollution during construction, especially suitable for operations in areas with noise control such as schools, social communities, and urban areas.
  • No vibrations. Suitable for vibration-control areas such as subways, overpass, dangerous buildings, precision instrument buildings and those nearby banks.

3, Specifications:


Parameter/ModelZYC360
Rate piling pressure(KN)3600
Piling speed(m/min)Fast7.1
Low1.9
Piling stroke(m)1.9
Pace(m)Longitudinal3.6
Horizontal0.7
Angle range(°)11
Rise stroke(m)1.1
Square pile(mm)Max500
Circle pile(mm)Max600
Side piling(mm)1250
Corner piling space(mm)2500
Lifting weight(t)12
Pile hanging length(m)14
Power(KW)Piling74
Lifting30
Main dimension(m)Work length12.7
Work width7.1
Transpot height3.15
Total weight(t)360

4, Feature Advantage:


  • ·Unique design of clamping mechanism for each jaw to be adjusted with the shaft bearing surface to ensure the largest contact area with the pile,avoid damaging the pile.
  • Unique design of side/corner piling structure, improves the capacity of side/corner piling,the pressure force of side/corner piling up to 60%-70% of main piling. The performance is much better than hanging side/corner piling system.
  • Unique clamping pressure-keeping system can automatically fill in the fuel if the cylinder leak oil,ensuring high reliability of clamping pile and high quality of construction.
  • Unique terminal pressure-stabilized system ensures no float to the machine at rated pressure,greatly improving the safety of operation.
  • Unique walking mechanisim with lubrication cup design could realize durable lubrication so as to extend serivice life of rail wheel.
  • Constant & high flow power hydraulic system design ensures high piling efficiency.


China Auger Foundation Pile Drill Rig 360T Piling Capacity Eco - Friendly supplier

Auger Foundation Pile Drill Rig 360T Piling Capacity Eco - Friendly

Inquiry Cart 0