Add to Cart
Turnkey Project Automatic Diary / Concentrated Juice Processing Equipment
Description
This equipment is characterized by annular type structure of heat
exchanger, high efficiency, energy- -saving and easy operation. It
is widely used for the sterilization of liquid materials like fresh
milk, sauce, beverages, liquors and also used for the sterilization
of soybean milk and liquid medicine. If mated with homogenizer,
this equipment can also be used at materials with high viscosity
like beet condensed milk and etc.
Production handling capacity:1 ~ 4 t/h;
Sterilization temperature:115~ 145℃;
Holding time:4 -6s;
Control modes: Manual, automatic;
Major configurations:Designated pump for materials, balance barrel,
heater, double cover coil heat exchanger. Temperature-controlling
and recording instrument (optional), electrical control system
(optional) and etc.
Parameter
Name | Unit | UHT-1 | UHT-2 | UHT-4 |
Production capacity | th | 0.7-1 | 1.5-2 | 3.5-4 |
Outlet temperature of materials | ℃ | <65 | <65 | <65 |
Sterilization | ℃ | 115-145 | 115-145 | 115-145 |
Hoiding time | S | 4-6 | 4-6 | 4-6 |
Inlet temperature of steam | MPa | ≈0.8 | ≈0.8 | ≈0.8 |
Steam consumption | kg | 0.15 | 0.15 | 0.15 |
Power | kw | 2.2 | 3 | 4 (6) |
External dimensions (length×width×height) | mm | 1314×925×1650 | 1500×1050×1800 | 1750×1350×2000 |
Production line
Complete fruit juice processing machinery procedure
1. Water treatment system
Raw water -> raw water tank -> raw water high pressure
pump->multi- medium filter (Quartz sand filter) -> active
carbon filter-> sodium ion exchanger-> water pump->
precision filter -> RO device ->ozone device ->pure water
tank
Remark: Supply water for juice blending tank and
washing-filling-capping units
2. Juice preparation making treatment system
Sugar melting tank -> sugar filter -> Juice blending tank
->juice homogenizer ->vacuum De-aerater -> storage
tank->UHT ultrahigh temperature instant Sterilizer-> heating
and cooling tank
3. Filling and packing line
Bottle mould blowing machine -> bottle unscrambler-> air
conveyor -> auto washing-bottling -capping units ( monobloc
3-in-1 machine) -> inverted bottle sterilizer->bottle cooling
machine ->jet printer-> auto hot shrink labeling machine
-> hot shrink label tunnel-> bottles plastic shrink packing
machine bottle dryer->jet printer-> auto hot shrink labeling
machine -> hot shrink label tunnel->auto film shrink wrapping
packager-> stacker by worker
Plate UHT sterilizer
|
Pipe UHT sterilizer
|
High pressure homogenizer
|
Vacuum degasser:
|
UHT instantaneous sterilizer:
|
CIP(Clean-in-place) System
|
CIP Technical parameter
Operation temperature | 60-138ºC |
Cleaning time | 12min/time |
Sequence of cleaning liquids | Clear water---alkali liquid---acid liquid---clear water |
Material name | 2% Nitric acid liquid, 2% caustic alkali liquid, 2% clear water |
Outline dimensions | 3240*1740*1950mm |
Steam pressure | 0.3-0.7MPa |
Motor power | 2.2kw |
Centrifugal pump flow | 10m3/h |
Centrifugal pump lift | 40m |
Equipment weight | 1050kg |
FAQ
Q1: What kinds of product you supply?
A1: Bottled water whole production line, 5 gallon drink water
production line , Juice, carbonated beverage,Packing system;PET
bottle blowing machine;water treatment machines,etc.
Q2: Do you have reference project?
A2: We have reference project in most countries,If we get the
permission of the customer who has brought the machines from us ,we
can tell you their contact imformation,you can go to vist their
factory.
And you are always welcome to come to visit our company,and see the
machine running in our factory,we can pick you up from the station
near our city.
Contact our sales people you can get video of our reference running
machine
Q3: Do you provide customized service?
A3: We can design the machines according your requirements(materil
,power,filling type,the kinds of the bottles,and so on),at the same
time we will give you our professional suggestion,as you know,we
have been in this industry for many years.
Q4: What's your guarantee or the warranty of the quality if we buy
your machines?
A4: We offer you high quality machines with 1 year guarantee and
supply life-long technical support.
Q5: How long time for installation?
A5: According your machines order,we will send one or two engineers
to your plant,it will take about 10 days to 25 days.
Contact us
Contact person: Vickie Sun
MOB (whatsapp / wechat): 0086 13584426100
Email: sunpiu2012@gmail.com
Skype: vickiesunqiu
More photos for ref
»»» »»» »»» WELCOME TO VISIT US ««« ««« «««