Home /Moulds /

Electronic Enclosure Custom Injection Molding Blake ABS PP Mould 0.01-0.05mm Tolerance

Electronic Enclosure Custom Injection Molding Blake ABS PP Mould 0.01-0.05mm Tolerance

Brand Name:RJC
Certification:ISO9001:2015&2017,D277435, 13485
Minimum Order Quantity:1 piece
Delivery Time:5-10days
Payment Terms:D/A, L/C, D/P, T/T
Place of Origin:China
Contact Now

Add to Cart

Verified Supplier
Location: Shenzhen Guangdong China
Address: 3rdFloor ,3Building, Beifang Yongfa Sci. &Tech Park, XinerZhuangCun 2Rd Shajing Town, Bao'an District Shenzhen city,Guangdong,China
Supplier`s last login times: within 1 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

PRODUCT DESCRIPTION


CompanyShenzhen RJC Technology Co,Ltd
Design SoftwareUG,Pro E Solidwork,AutoCAD,Moldflow....
Core&Cavity MaterialP20,H718,S136,SKD61,2738,DC53,H13....
Mold baseHASCO ,DME ,LKM,JLS standard
Mould CavitySinge or multi cavity
Mold strandard partsDME, HASCO, etc.
RunnerHot runner, Cold runner
Hot Runner BrandYudo/ Mastip/ HASCO/ DME/ MOLD-MASTER…etc
Mold cold runnerSide gate,Sub gate,Pin point Gate...
Mold surfaceEDM, texture, high gloss polishing
Hardness of the steel20~60 HRC
plastic Injection Machine10sets,110T,140T,160T, 200T,260T,320T
Plastic MaterialPP,Pa6,ABS,PE,PC,POM,PVC, PET,PS,TPE/TPR etc
MOQ1set for mold ,plastic products as per your request
Mold Life300000-500000 shots as per customers' requirement
InspectionAs customers’ requirements
DeliveryAir cargo, Sea shipping
Lead time25-35days for mold,plastic products according to quantity
KeywordCustom molding machining abs pvc abs parts small injection plastic product

Material:

Plastic Mold (Mould) production process:


1. 3D drawing/Samples for quotation: According to 3D drawing or samples for quotation.


2. Negotiations: Including the price of moulds, moulds sizes, material for cores & cavities, weight of product, product color, payment, moulds lifetime, delivery, etc.


3. Purchasing Order : After the customer confirming the mould design and quotation.


4. Making mold(moulds): Confirm drawing, start to do DFM, mold flows and mold detail agreed with the customer, start producion.


5. Production schedule: Every week we will feedback to the customer about the mold progress(picture).


6. Sample shoot: We provide the moulds test samples for confirmation(about 10-15 piece), we will start mass production when get your

signature samples.


our services:

1. we can offer samples,and we accept try order.

2. we accept OEM services.

3. ensure quality

Main equipment:

1. 5 sets CNC Center, VMC-850, 3/4 axis

2. 10 sets NC lathes, 6130/6135/6140/6150

3. 5 sets lathes, 6140/6150;

4. 8 sets stamping machines, 50/100/300mt press;

3 sets forging machines, 300/800mt press

10 sets drilling machines;



Q: How many people work in engineering department and also in workshop?

A: 10 senior engineers and over 30 technical designers,Total with 200 employees.

Q: I have an idea for a new product, but don't know if it can be manufactured. Can you help?

A: Yes! We are always happy to work with potential customers to evaluate the technical feasibility of your idea or design and we can advise on materials, tooling and likely set-up costs.

Q: Can I test my idea/component before committing to mould tool manufacture?

Yes, we can use CAD drawings to make models for design and functional evaluations.

Q: Do you have the checking system to make sure the mould quality?

A: We have a complete management system. Our project dept. will arrange mould checking and supply the checking report in detail. Only when the mould is qualified, can the mould be shipped out.

Delivery details:

1) Our production cycle :

Item will be shipped within 3-7 working days after we get your Payment, We are always serious on the delivery time, all orders will be checked by us carefully to make sure there is no delay on the shipment.

2) Shipping Methods:

a).If order is not very big, we will send you by UPS, DHL, FEDEX, or TNT. Tracking number will be advised after delivery, all of express lead time is about 3-5 working days.

b).If order is big, we will advise you use Air Freight or Sea freight.



Payment details:

1) . Payment terms:

a) 100% in advance for Small value .

b) 50% deposit, 50% before delivery for big value.

2). We can accept T/T, Western union, Paypal, L/C etc.

Q: how to contact with sales ?

A: You can send inquiry of our products,it will be replied within 1 hours.

Q: What information should I give to you for inquiry?

A: If you have drawings or samples,pls feel free to send us,and tell us your special requirements such as material ,tolerance,surface treatments and the amount you need,ect .

Q: Is it possible to return the money if the quality is not good?

This has never been occured right now ,as we treat the quality as our key of development.Quality and service is everything for us.

China Electronic Enclosure Custom Injection Molding Blake ABS PP Mould 0.01-0.05mm Tolerance supplier

Electronic Enclosure Custom Injection Molding Blake ABS PP Mould 0.01-0.05mm Tolerance

Inquiry Cart 0