Home /Steel Structures /

Prefab Workshop Steel Buildings With Mezzanine Steel Structure Fabrication

Prefab Workshop Steel Buildings With Mezzanine Steel Structure Fabrication

Brand Name:Ruly Steel
Certification:SGS, BV, ISO
Model Number:Ruly0178
Minimum Order Quantity:500 Square Meter
Delivery Time:30 Days
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Qingdao Shandong China
Address: Tieshan Industrial zone, Huangdao District, Qingdao City.
Supplier`s last login times: within 40 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Prefab Workshop Steel Buildings With Mezzanine Steel Structure Fabrication


Project Information:

Prefab Workshop Steel Buildings With Mezzanine Steel Structure Fabrication. This is a Prefab Metal Workshop Buildings With Mezzanine. Welded H-section steel beams and columns are connented by high strength bolts to be the main frame structure. It also has partial mezzanine inside to store goods and provide office area. Galvanized steel floor deck is used for the mezzanine floor.All the steel structure are fabricated in our factory. Welded steel structure has good rigidity and light weight, which provides favorable conditions for production, transportation and installation.

Qingdao Ruly Steel Engineering Co.,Ltd is a professional steel structure fabrication and construction company for light and heavy steel structure Design, Manufacture & Installation.


Specification of steel structure material:

Item name

SpecificationMaterial ParameterTechnical Treatment
ColumnH shaped steelQ235B,Q345BPaint or Hot dip galvanized
BeamH shaped steelQ235B,Q345BPaint or Hot dip galvanized
BracingSteel rod,Steel pipe,Angle steelQ235B,Q345B
PurlingC or Z shape, purling Thickness:1.8mm~3.0mmQ235B,Q346BHot dip galvanized
Wall and roof panelEPS,Rock wool,Pu,Glass wool Sandwich panel or Single sheet.Steel T=0.426~0.8mm,insulation T=50~150mmAlu-zinc 150g, Fluorocarbon paint
DoorSliding or rolling doorSteel or Aluminum sheet,T=1.0~1.5mmPaint or Hot dip galvanized
Windowalloy-Glass,Aluminium alloy-shutterT=1.0~2.0mmAlloy
Lighting panelFRP, T=1.5mm or T=1.8mmCoefficient of thermal expansion:2.2x10-5/cm/cm/℃Light transmittance 85%
VentilatorTurbine ventilator, and electric typeSteel,stainless steel,PCPaint or Hot dip galvanized,304
GutterGalvanized or stainless steel plateT=2.0mmHot dip galvanized,304
DownpipePVC pipe,Color steel pipe T=0.5mmΦ110,160,200Paint
BoltOrdinary, high strength10.9S,4.8sHot dip galvanized
Anchor boltSteel rod M24,M27 M30Q235B

Advantages of prefabricated steel structure buildings:

1High strength and light weightAlthough the density of steel is larger than that of other building materials, its strength is very high. Under the same force, the steel structure has a small weight and can be made into a structure with a large span.
2Good plasticity and good toughnessThe plasticity of the steel is good, and the structure will not suddenly break due to accidental overload or partial overload. The toughness of the steel is good, making the structure more adaptable to dynamic loads.
3High degree of industrialization in productionThe steel structure is mainly produced in a specialized metal structure factory, so the production is simple and the precision is high.
4Simple construction and short construction periodAll components are prefabricated at the factory, and the site is simply assembled, which greatly shortens the construction period.
5Wind resistance and structural stabilitySteel structure construction with light weight, high strength, good overall rigidity and strong deformation ability
6Saving construction costsThe steel structure has light weight, reduces the basic cost, and has a fast construction speed. It can be completed and put into operation as soon as possible, and the comprehensive economic benefits are much better than the concrete structure.
7RecyclableSteel can be recycled, less environmentally polluted when constructed and removed

How to install:

We will provide construction drawing for each project to guide installation. We will teach you the installation in our factory. We could dispatch our engineer to guide installation on site or we install it by our construction team.


Packing and transport:

All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.

All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.

China Prefab Workshop Steel Buildings With Mezzanine Steel Structure Fabrication supplier

Prefab Workshop Steel Buildings With Mezzanine Steel Structure Fabrication

Inquiry Cart 0