Home /Valves /

High Rise Building Install Pump Control Valve Flange Connection 300PSI Pressure

High Rise Building Install Pump Control Valve Flange Connection 300PSI Pressure

Brand Name:WINAN
Certification:CCC ISO
Model Number:700X
Minimum Order Quantity:10
Delivery Time:Shipped in 10 days after payment
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Active Member
Location: Shenzhen Guangdong China
Address: No. 18, Fengshun Road, Tongle, Longgang District, Shenzhen City, Guangdong, China
Supplier`s last login times: within 39 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

High-rise Building Install Pumps , Pump Control Valve Flange Connection


Introduction:


700X Pump control valve is a high-rise buildings to install the pumps and other water supply system at the exit to prevent the media back in the class check valves, when the pump is about to stop only the water supply before the first slow off the valve about 90%, to prevent the sudden stop of water pumps and generating sound of hammer and water hammer, when the pump completely stopped, and then completely closed the valve to prevent pump the water back out and effective protection of pumps, resulting from the impact of return reversal, the product is essential for pump outlet protection device, the valve is streamlined design, through the solenoid valve open and close guidance and control to achieve accurate, safe, reliable, and effective to prevent water hammer and water hammer noise, long life, easy maintenance.

This vavle is suitable on system such as petroleum, chemical industry, foodstuff, medicine, papemaking, water and electricity, shipping, plumbing, the smelting and sources of energy etc the pipe route. Can regard on gas, liquid, semifluid as well as solid powder pipes and power lines and the container of many kinds of corrosiveness and non-corrosiveness adjusts and dams a river the equipment use. Especially extensively being in high layer of building fire protection system reaches other to show in the pipes and power lines system of valve of vavle switch state.


Parameter:


Main dimensions

DN

(mm)

20253240506580100125150200250300350400450500600700800
L180180180203203216241292330356495622698787914978978129514481956
1.0D1051151351451601801952152452803353904405005656156707808951010
D17585100110125145160180210240295350400460515565620725840950
1.6D1051151351451601801952152452803354054605205806407058409101020
D17585100110125145160180210240295355410470525585650770840950
2.5D1051101351451601801952302703003604254855506106607308409551070
D17585100110125145160190220250310370430490550600660770875990
H34234234239539540543051056058567573076084091010301135127014601640
H1247247247278278298313350365420450470490526570610665725865975

注:安装示意图中弹性座封闸阀或蝶阀任选,建议>DN350选蝶阀.

Note: Either elastic seat ring sealed gate valve or butterfly valve can be selected in the schematic diagram of installation. Recomended to select the butterfly valve in case of >DN350.


Features:


The valve installed in the pipeline, using guide tube, remote control solenoid valve to control the opening and closing the main valve on and off.


Main Material:


Product Name
Pump Control Valve
Material
Cast Iron, Ductile Iron, Stainless Steel, Carbon Steel
Color
Blue, red, purple or customer require
Standard
API609, AWWA C504, DIN3354 F4, GB/T12238, JIS 10K, BS5155
Connection
Flange
Media
water, gas, oil etc.
Size
1/2''-- 32''
Certificate
ISO9001-2008


FAQ:


Q1. What is your payment term?
A: T/T 30% down payment, balance to be paid before shipment. or L/C.

Q2: What is your main market?
A: Western Europe, North America, Janpan,,

Q3: Can I get samples from your factory?
A: Yes, sample is free, but the express charge is yours.

Q4: If products have some quality problem, how would you deal with?
A: We will responsible for all the quality problems.

Q5.Are you manufacturer or trading company?
A.We are manufacture(cast iron) and trade company.

Q6. what’s the payment term?
A. We accept T/T, L/C,WESTERN UNION

Q7. What’s the delivery time ?
Pattern needs 30-60 days, sample need 30-50 days.
The first order need 60 days

Q8. What is the standard of package?
A. Export standard package or special package according to customer requirement.

Q9. Do you accept OEM business?
A. Yes, we are OEM supplier.

Q10. what kind of certificate you have ?
A .We have ISO9001, ISO14001,PED,SGS


China High Rise Building Install Pump Control Valve Flange Connection 300PSI Pressure supplier

High Rise Building Install Pump Control Valve Flange Connection 300PSI Pressure

Inquiry Cart 0