Home /Preforms /

Stainless Steel Plastic Preform Mould , Water Bottle Mold With 3D / 2D Drawing

Stainless Steel Plastic Preform Mould , Water Bottle Mold With 3D / 2D Drawing

Brand Name:Eceng
Certification:CE&SGS&ISO
Minimum Order Quantity:1set
Delivery Time:30 working days
Payment Terms:L/C, T/T, Western Union
Place of Origin:China
Contact Now

Add to Cart

Active Member
Location: Suzhou Jiangsu China
Address: Xitang Road On The 18th,Xizhang Town,Zhangjiagang,Suzhou City,Jiangsu Province,China
Supplier`s last login times: within 11 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

High Quality Plastic pet preform mold/water bottle preform molds/plastic bottle mould

Name

Description
Mould material45#, P20, 718, 2738, S136 etc.
Mould baseC45#, LKM, HASCO etc.
CavitySingle / Multi-cavity
RunnerHot / Cold
Mould design3D / 2D Drawing
Design days2-3 days
Design softwareUG,PROE,CAD,CAE,CAM,CAXA ect
Plastic materialPET,PP,PE,ABS,PS,PC, etc.
Mould life3,000,000 shots
Packing detailwaterproof film & painted anti-rust oil put in Wooded case
Polish systemMirror polish
PaymentT/T, 50% deposit , 50% before shipment
Delivery time10-15 days
SpecificationDepends on customers requirements


Business Step:

1. R&DWe support customer R&D. Make the files or improve the design if you needed
2. QuotationQuotation will according to our customer information
3. NegotiationThe quality, price, material, delivery time. payment item ect.
4. Mould Design3-5 days for mould and product 3D/2D drawing design


5. Mould

According to customers' request to build the mould. Before make the mould ,
we send mould design to customer approval first .
Mould will be usually finished in 10-15 days


6. Mould Testing

When mould are finished, we will test the mould to check it and send the sample for consumers' reference.


7. Sample

If the first sample come out is not satisfied with customer needed .we modify the mould and until meet customers satisfactory
8. DeliveryDelivery goods by sea or by air, according to customers requirement


Mould Maintenance:
♦ Thermal oil: adopting the hydraulic oil for the maintenance to get in the inlet of cooling water, which can play a lubrication, rust-proof role.
♦ Maintenance of guiding column: guiding column should be painted a small amount of hydraulic oil, cycle once a month.
♦ It needs to be painted rust preventive if it stops production for long time.














China Stainless Steel Plastic Preform Mould , Water Bottle Mold With 3D / 2D Drawing supplier

Stainless Steel Plastic Preform Mould , Water Bottle Mold With 3D / 2D Drawing

Inquiry Cart 0