Home /Bitumen /

EINECS 266-028-2 Coal Tar Uses , Cold Bitumen Asphalt Pitch For Waterproof Material

EINECS 266-028-2 Coal Tar Uses , Cold Bitumen Asphalt Pitch For Waterproof Material

Brand Name:JH
Model Number:JH09
Minimum Order Quantity:Negotiable
Delivery Time:5-8 workdays
Payment Terms:L/C, T/T
Place of Origin:Handan
Contact Now

Add to Cart

Active Member
Location: Handan Hebei China
Address: 2nd Floor,Room 3002, Unit 3, A Rongfu Center, No. 179, Renhe Street, Congtai District, Handan City,Hebei Province,China (Mainland)
Supplier`s last login times: within 27 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Manufacture High Temperature Coal Tar Pitch Cold Bitumen Asphalt Pitch For Waterproof Material


Definition: the pitch obtained from deep process of coal tar or general coal pitch.

Application courses: Coal Science and Technology (first-grade subject); Coal Utilization and Processing (Second grade subject); Coal reversion (third grade subject).

Physical and chemical properties:

It is black brittle solid at a normal temperature, glossy; odoriferous, toxic.

Boiling point: less than 470°C, flash point: 204.4°C, relative density (moisture=1): 1.15~1.25.

This product complies with YB/T5194-93 modified pitch standard.


Quality specification:

Name of specification: specification (first grade)

IndexResult
Chemical Property
SOFTENING POLNT (℃)110
Fixed Carbon59
TI (%)28
QI (%)11
Coking Value (%)58
Volatile Matter (%)46
Ash (%)0.17
Moisture (%)0.5
Physical Property
AppearancePencile Shape

Note:

Modified Pitch

Qualified


Packaging & Shipping

1MT Jumbo bag,20mMT IN 20' FCL or Bulk


Our Services

(1) Create value for our valuable customers

We always provide good quality and nice design products to meet the needs of the customers. We are the leader in this field and we always provide good products and service to our valuable customers.

(2) Better Quality with Lower Price

We always supply the better price on the same quality level, and try our best to save the client’s every cent.

(3) Never stop developing the New Product.

Every year, our company will develop the new products to meet the market need.

(4) Manufacture & Export experts

FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment1000USD, 100% in advance. Payment1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us as below:

Contact

Contact Person:Jack

Handan Jinghao Chemical Co., Ltd.

Room 3003,Unit 3,A Rongfu Center,No 179,Renhe Street,Congtai District, Handan, Hebei, China (Mainland)

E-mail:dong at hdjh88.com

Tel:+86-15803300831.

Skype:live:yuanll871213


China EINECS 266-028-2 Coal Tar Uses , Cold Bitumen Asphalt Pitch For Waterproof Material supplier

EINECS 266-028-2 Coal Tar Uses , Cold Bitumen Asphalt Pitch For Waterproof Material

Inquiry Cart 0