Home /

High Loading Capacity Scaffolding Steel Prop Q235 Steel Pipe Zinc Plated Surface

High Loading Capacity Scaffolding Steel Prop Q235 Steel Pipe Zinc Plated Surface

Brand Name:HORIZON
Certification:SGS
Model Number:Scaffolding Prop
Minimum Order Quantity:2000 pcs
Delivery Time:15-25 days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Site Member
Location: Xingtai Hebei China
Address: VICTORIA HOTEL BUILDING, ZHONGXING ST. XINGTAI, HEBEI, CHINA
Supplier`s last login times: within 48 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

High Loading Capacity of Scaffolding Prop for Slab Concrete Construction


HORIZON props are used for the shoring on many building sites and our customers appreciate them for their high efficiency and ease of use.

The high load capability makes HORIZON props the top choice offering reliability and safety for any construction job.

Excellent quality is guaranteed by using high quality of raw materials, the manufacturing process and final treatment applied to the props. All these result in safe and efficient use on sites.

The manufacture of Telescopic Props is certified in accordance with standard EN 1065.

SpecificationCapacity (KN)Height (mm)Dia (mm)Weight (Kg)
HZP30-300301650-300076/6320.9
HZP30-350301970-350076/6323.0
HZP30-400302210-400076/6325.0
HZP20-300201650-300060/4815.7
HZP20-350201970-350060/4816.6
HZP20-450202460-450060/4828.2
HZP20-500202710-500060/4830.5



Important Instructions:
• Once erection is finished, double-check the props before use.

• Respect the prop spacing in accordance with the project.

• Prop load capacities and engineer’s design must be observed.

• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.

• Check formwork and prop erection before concrete pouring.

• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.

• Avoid the sudden emptying of the concrete bucket onto the formwork.

• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.

• Before starting any dismantling operation, check the state of the props.

• After removal, props should not be irregularly piled up.

China High Loading Capacity Scaffolding Steel Prop Q235 Steel Pipe Zinc Plated Surface supplier

High Loading Capacity Scaffolding Steel Prop Q235 Steel Pipe Zinc Plated Surface

Inquiry Cart 0