Home /

Steel Q235 Hex Rod Coupling Nut 100/110mm Length Equipped With Stop - Pin

Steel Q235 Hex Rod Coupling Nut 100/110mm Length Equipped With Stop - Pin

Brand Name:HORIZON
Certification:SGS
Model Number:Steel Hex Nut Coupler
Minimum Order Quantity:10000 pcs
Delivery Time:15-25 days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Site Member
Location: Xingtai Hebei China
Address: VICTORIA HOTEL BUILDING, ZHONGXING ST. XINGTAI, HEBEI, CHINA
Supplier`s last login times: within 48 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Steel Hex Nut and Couplers with Stop-pin for Threadbar Connection


Steel Hex nut is as steel bar connector, connecting two bars in the reinforcement work. A stop-pin is fixed in the middle of the nut to secure the screw-in length of the bar.

Item No.Bar dia. (mm)Length (mm)Hex. (mm)Weight (Kg)
HN-50/151550300.22
HN-60/151560300.25
HN-100/20*20100360.60
HN-110/20*20110360.66
HN-130/20*20130360.78

Note: " * " means equipped with stop-pin in centre.


Machining produced, weldable, galvanized;
Customized size available. Other different sizes are available: for bar dia15mm, 20mm, 26mm.
Besides the weldable nuts, casting iron hex. nuts are also available according to requirments.


Part NameSpecificationWeight (kg)Remark

Tie-rod


D15

D20

1.52 kg/m

2.71 kg/m

L=6m;

Special length available upon request.

Wing nut


D15

D20

0.35

0.70

For tie-rod D15 / D20

Super plate


D151.28Used in case of tie-rod and formwork panels are not vertical.

3-lug wing nut


D15

D20

0.97

0.78

For tie-rod D15;

For tie-rod D20

Waling plate


120 x 120 x 6, Φ19

120 x 120 x 8, Φ19

0.65

0.85

For tie-rod and nut D15;

galvanized

Water stopper


D15

D20

0.55

0.72

Used in water resistant wall;

With tie-rod D15 / D20

Anchor plate


D200.95Embedded in concrete as lost part


Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.


Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

Who we are:
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.


What we offer:
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.


Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.


HORIZON FORMWORK, your reliable formwork partner!

China Steel Q235 Hex Rod Coupling Nut 100/110mm Length Equipped With Stop - Pin supplier

Steel Q235 Hex Rod Coupling Nut 100/110mm Length Equipped With Stop - Pin

Inquiry Cart 0