登录 | 免费注册 | 提交网站 | 免费看询盘 | 外贸旺站免费建站 | "贸易通"多语言推广 | 外贸论坛
Hot Products:
Home > Other Security & Protection Products >

PM For Automobile Components

PM For Automobile Components

Minimum Order Quantity: 1000
Payment Terms: L/C,D/A,D/P,T/T,Western Union,MoneyGram
Place of Origin: China
Price: US $ 0.1 - 5 / Piece
Packaging Details: such as carton,wooden box, Retail packing available. We can custom anything about PIM with your company logo as your request.
Supply Ability: 1000
Sofine Gian PIM Tech Co., Ltd.
Active Member
China
Business type: Manufacturer
Supplier`s last login times: within 21 hours

Product Description

PM For Automobile Components Of Different Brands

1. We specialized in the PIM technology of research and development, production and service,

which include PM products and so on.

2. Process:powder metallurgy / metal injection molding

3. High precision,100% quality with competitive price.

4. We can make the products according to customers' drawings or requirement (OEM).

5. Short delivery time.


Customer Show ( Customer Approval Show Only )

——————————————————————————

Note:Sofine PIM is not authorized to use their names, these names are just to shows our skill level and products standards.


Quality Assurance

——————————————————————————


6.jpg


  • Obtained ISO9001: 2000 version quality system certification in August 2007.
  • Obtained ISO9001: 2008 version quality system certification in October 2010.
  • Obtained QC080000:2005 version certification in October 2010.
  • Obtained certifications of TS16949 in April 2013.
  • All products have SGS or CTI report, conform to Environmental request of RoHS.Material has test report of REACH.
Our Services

Based on the whole life cycle product and project management, Sofine provides "one-stop" end to solution from design conception to perfect fulfillment. this practice makes the cost effective, best quality and delivery value added to our customer.

Sofine have professional PIM team over 10% of total employees, many of them have more than 15 yesrs experences in PIM field. We can provide world class design and engineering practice to customer by ways of tooling design, prototyping, and advanced technology R&D lab transferring.


Post Process

——————————————————————————


Cosmetic Base Post Process information are Subject to Material & Requirements

CNC

Post Process

Some complex shape product need CNC/ Machining during the post process,this could be addition but it is not important that every part must need it. This depend on part's requirements.
PVDPossible to get the different PVD color such as White,Black,Golden,Brown,Green,Blue ect……
Surface FinishMIM product are good to get the required surface finish such as hair line surface finish,brush finish,sand blast mirror surface finish ect

Plating

MIM material can be readily plated or surface treated with standard process used on wrought material with no need for special surface preparation.Examples of some plating and surface
treatments offered are: electrolysis nickel,chrome,zinc,chromatic,nickel teflon,black oxide and passivisation.


Company Information

Overview

——————————————————————————

2.jpg

  • Professional PIM turnkey solution provider since 2004
  • 15+ patents of invention in binders and process design
  • 700+ employees, 10%+ from engineering and R&D
  • Over 250 Tons annual power consumed capability
  • 35,000 square meters of facility

Technology Strength

——————————————————————————

111_.jpg

222.jpg

3.jpg

FeatureBest Possible ±Nominal or Typical ±
Absolute dimension0.025mm(0.001 inch)0.05mm(0.002 inch)
Angle0.05°
Density0.20%1%
Dimension0.05%0.30%
Fatness0.10%0.20%
Hole diameter0.04%0.10%
Hole location0.10%0.30%
Parallelism0.20%0.30%
Perpendicularity0.1% or 0.1°0.2% or 0.3°
Mundness0.30%0.30%
Surface roughness0.2μm(8 μ inch)0.8μm(32 μ inch)
Weight0.10%0.40%
Comer radius0.5mm(0.02 inch)0.3mm(0.012 inch)

Business Distribution

——————————————————————————


444.jpg

Process Description

——————————————————————————


123.jpg


1.GIF
Metal powder of fine partical size is mixed with thermoplastic polymer to form a mixture of ingredients konwn as feedstock. The feedstock made into pellets and fed into the moulding machine.2.GIF
The feedstock is heated to melt the plastic and molded to the desired shape. The moulded parts is known as green part.
The binder is removed thermally by heating to around 400 degree centigrade from the green part,by a debinding process. The debound parts called as brown parts and is brittle and porous.
The brown parts is heated to more than 1200 degree centigrade,in the finale sintering process allowing the part into a dense solid with the elimination of pores. The sintered density is wimilar to a casting at about 98% of theoretical.

Product Management


——————————————————————————

ESI ( Earlier Supplier Involve )

  • Conception modeling and optimize
  • design for manufacturing assessment
  • Cost-effective modeling

Tooling Design & Fast Prototyping

  • Tooling design and fabrication
  • Fast prototyping
  • Failure mode effective analysis
  • Sample qualification by 3rd party testing

Net-shape

  • NPI management
  • Process fine-tune
  • Self-motivated cost down plan
  • Capacity and delivery balancing

Secondary Operations

  • Maching,laser welding
  • Surface finish
  • Heat treat
  • Final assembly if necessary

Surface finish:electroplate, PVD, sandblasting, painting, polishing and laser engraving etc.


Design Guideline

——————————————————————————

Fast assessment of a part suitable for metal or ceramic injection molding based on:


  • Cost-effective

Normally yearly demand over 20k and typical weight from 0.02-50g will be highly cost reduction when tooling cost and raw material cost been considered.


  • Geometry complex

PIM technology is specially profit for component has holes,slots,ribs,protrusions,and multiple features.The typical max outlet is range from 25mm to 35mm,wall thicjness 0.08 to 10mm.


Several aspects of the PIM component design improve the ease of manufacturing,and there are a number of design features that should be avoided. These are categorized as follows:


Allowed design features

  • Axisymmetric,nonsymmetrical,prismatic,square,and freeform features
  • Cantilever and nonsymmetrical shapes
  • Stiffening ribs and locator features for assembly
  • Protrusions,bosses,and studs
  • Most hole shapes are allowed, including blind and through holes
  • Holes at angles to one another
  • Undercuts, grooves,slots,depressions
  • External teeth,external or internal threads
  • Knurled and waffle surfaces
  • Part number or identification logo created by the mould

Features to avoid

  • Inside closed cavities
  • Undercuts on internal bores
  • Very shape corners or design-desired radius greater than 0.05mm
  • Long pieces without a draft or taper to allow ejection
Packaging & Shipping

Packaging:

Standard sea or air packing for powder metallurgy products,such as carton,wooden box, Retail packing available. We can custom anything about PIM with your company logo as your request.


Shipping:

Sea,Air,TNT,UPS,EMS,DHL,FEDEX

FAQ

Q: What is MIM technology ?
A: MIM (Metal Injection Molding) is a manufacturing technology that combines the shape making complexity of Plastic Injection Molding with the material flexibility of Powder Metallurgy.


If you want to know more about PIM, please click herewhat's PIM.





Product Tags:

automobile component mould

      

automotive component mould

      

cnc machine component

      

PM For Automobile Components Images

Send your message to this supplier
From:
Enter your email please.
To: Sofine Gian PIM Tech Co., Ltd.
Subject:
Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0
Other about

PM For Automobile Components

Auto Spare Parts For Automobile Safety System Components

Minimum Order Quantity :1000 Piece/Pieces For Auto Parts
Delivery Time :30Day(s) For Auto Parts

PM For Automobile Components

Minimum Order Quantity :1000
Payment Terms :L/C,D/A,D/P,T/T,Western Union,MoneyGram

MIM Part For Car Spare Parts

Delivery Time :30Day(s) For MIM Part
Payment Terms :L/C,D/A,D/P,T/T,Western Union,MoneyGram

Powder Metallurgy For Automotive Lock

Delivery Time :30Day(s) For MIM Part
Place of Origin :Zhejiang, China (Mainland)

Powder Metallurgy For Automotive Lock

Delivery Time :30Day(s) For MIM Part
Place of Origin :Zhejiang, China (Mainland)