Add to Cart
Stainless Steel Frozen Food Storage Warehouses , Industrial Refrigeration Freezer Food Processing
Quick details:
Cold room specification:
Room function | Designed temperature range | |
°C | °F | |
Frozen food cold storage room | -25~-18 | -13~-0.4 |
Corridor for temperary store | 0 | 32 |
Our Advantages:
Decades years of field experts, experienced engineers
Application sites:
Food processing factory, fish processing factory, cargo distribution center, Large super market distribution center, Logistics and Transfer center etc
Tips of chosing a properly site to build a cold room:
1. Should choose a site that seperate from residential areas a certain distance and located the down the wind to avoid pollution.
2. Should chose a site near to railway station or seaport that would be convenient to load/unload goods
3.The convenient water&power supply nearby cold room is very important
4. Don't build a cold storage near airport
5. The undergroud waterlevel is too high isn't suit for building a cold room
6. The load bearing of undergroud must be enough for building a cold storage
7. The site selection not only needs to consider the trafic conditions but also need to consider the geographican condition ,the environment condition,weather condition etc
It's a comprehensive project that needs to consider every facet refers to the cold storage.
Workflow of purchasing a customized cold storage:
Step | Contents | Details |
1 | Client describe the requests and using methods | 1. Client provides some basic requirements; |
2. Client provides relative information: | ||
1) construction address, environment, weather, geology conditions, electricity supply; | ||
2) storage purpose and functions; | ||
Other design requirements | ||
2 | We offer sketch design and price | 1. Communication on details, discussion and modification until reach an agreement; |
2. sketch design; | ||
3. price offer on all systems | ||
3 | Contract and formal design | 1. Sign the former design contract (if any); |
2. Site survey and measurement (if necessary); | ||
3. Formal design and delivery; | ||
4. Details of solution and price. | ||
5. Client prepare the construction site and foundation. | ||
4 | Equipment and material export | 1. Sign the contract of equipment and materials; |
2. production and export preparation | ||
3. Client prepare the on-site electricity and water | ||
5 | Installation | 1. working procedure confirm and team organization; |
2. Construction teams go to install. | ||
6 | Check and acceptance | 1. Our technicians trial run the cold storage on-site; |
2. Client check and make acceptance. | ||
7 | Operation instruction and warranty | 1. training clients’ cold storage operators; |
2. provide technical support within the lifetime of cold storage. |
Cold room photos: