Home /Fiberglass Products /

Hot Dip Galvanized Electricity Transmission Substation Structure Steel Pole

Hot Dip Galvanized Electricity Transmission Substation Structure Steel Pole

Brand Name:JSBS
Certification:ISO9001:2008
Model Number:BS-1
Minimum Order Quantity:1 set
Delivery Time:within 15 working days
Payment Terms:T/T, L/C
Contact Now

Add to Cart

Verified Supplier
Address: Heqiao Industrial Zone, Yixing City, Jiangsu Province. China.
Supplier`s last login times: within 34 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Hot Dip Galvanized Electricity Transmission Substation Structure Steel Pole


Description:

For light weight and easy operation features, steel structure replaces the traditional concrete pole. With the advanced equipment for processing of steel tube towers, the factory produces steel structures mainly focusing on equal-diameter tubes and cone-shaped tubes in polygon and round shape. These products enjoy stable and reliable quality.


Material

Normally Q235B/A36, Yield Strength235MPa

Q345B/A572, Yield Strength345MPa

Power Capacity10kV ,13.8kV,69kV,110kV,132kV,220kV or other
Tolerance of the dimensionAccording to client’s requirement
Surface treatmentHot-dip-galvanized following ASTM123, or any other standard by client’s requirement
StandardISO9001:2008
Production ProcessRaw material test-Angle Marking -Hole Drilling-Angle Cutting-Angle Shovelling- Angle Fring –Angle Welding-Sample Assemble-Surface Clean-Galvanization -Recalibration-Packages
Packages

packing by bundles(set-wise or member-wise)with weight of 2~3 tons or according to client’s requirement


Manufacturing Process

→Raw material test (We buy the raw materials from famous mill factory here in China. We'll check the elements of the raw material like silicon, carbon, sulfur etc. in our lab test room. If they are unqualified, we'll return them. In this way, we can control the quality from the first beginning.)


→ Cutting


→Bending (imported 1600Tons Hydraulic Bending Machine)


→Welding (longitudinal penetration rate over 95%)


→Dimension verify

→Flange welding

→Hole drilling

→sample assemble

→ surface clean

→ Galvanization or powder coating, painting

→Recalibration

→Packages


After the fabrication process as cutting plate, bending, forming, automatic welding, drilling holes, we get poles checked before galvanized, hot dip galvanized and powder coating and finally we get poles checked according to client's requirements.


To ensure the quality, we have professional technicians to check the pole during the manufacturing and before delivery.



FAQ

1. Price Term: EXW, FOB, CFR or CIF.

  • The price includes pole shaft, base plate, crossarm and anchor bolt.

  • Shipping seaport: Shanghai Seaport.

  • Please provide drawings if you have so that we can calculate the accurate price for you.

  • We also provide design according to your requests, if you don't have drawings.

2. MOQ: One 40FT Container.

3. Payment Term: Typically 30% by T/T as a deposit, balance by T/T or L/C at sight before shipment. Other payment ways can be negotiated.

4. Delivery Time: 2 weeks per container after PO/drawing/prepayment confirmed.

5. Package: Normally wrapped by plastical bags or burlap cloth at the top and bottom, or according to clients requirement.
China Hot Dip Galvanized Electricity Transmission Substation Structure Steel Pole supplier

Hot Dip Galvanized Electricity Transmission Substation Structure Steel Pole

Inquiry Cart 0