China Categories
English
Home /Apparel & Textile Machinery /

Steel Silo Metal Roof Roll Forming Machine Gear Box Driven On Line Crimping

Steel Silo Metal Roof Roll Forming Machine Gear Box Driven On Line Crimping

Brand Name:Sussman
Certification:ISO9001
Model Number:SS01
Minimum Order Quantity:1
Delivery Time:2-3 month
Payment Terms:T/T
Contact Now

Add to Cart

Verified Supplier
Location: Wuxi Jiangsu China
Address: NO.18-1, Funan road,Wenlin, Zhutang Town, Jiangyin city, Jiangsu province, China.
Supplier`s last login times: within 28 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Steel Silo Roll Forming Machine


A. Working flow


De-coiler—feeding with guide→Straightening device→main rollforming machine→Curving device→run out table



B. Main specification:


1 Materials to form shutter door: 1.5-3.3mm galvanized coils, Feeding width: 914mm

2 Forming steps: about 18 stations

3 Material of rollers: Gcr15 steel precision-machined, high frequency quenching HRC58-62,

4 Material of main shaft : 45# high quality steel (diameter>¢50)

5 Cutting: hydraulic cutting; quenching HRC58-62

6 Electronic control: PLC control Panasonic Brand

7 Dimension of machine: 11500mmX1350mmX800mm

8. Working speed:12-15m/min;

9 Drive system: gear box drive

10 main motor power: 90kw

11. Punching moulds: 3 sets of punching dies at one time

12. Curving machine: Curving continuously to make the sheets straight, the min Radius 1.8m, the Radius can be adjustable.

13. Cutting: Hydraulic cutting

14. Hydraulic station power 55kw, the pressure 25-30Mpa.

15. Out table: lift auto stacker

16. Total Power 130kw


C: TRANSPORTATION


All goods will be shipped to your country, containers number will be decided with how many machines you would choose

. Installation of the machine

The individual components of the machine are installed according to the layout and prepared for the commissioning.

The installation comprises of:

- Installation by Sussman service technicians.

- The following services are included:

- Installation of the machine components.

- Adjustment of the machine components.

- Connection of all motors to the control cabinet.

- Installation of the required safety devices.

Delivery extent does not comprise of:

- Media supply (electrics, compressed air, etc.)to the machine(control cabinet)

- Raw material process material and fuels

- Raw material for test blocks

- Transport and lifting devices

- Auxiliary staff.

The operators of the plant should be present during the installation in order to become familiar with the new machines.


D. Commissioning of the machine


The components of the machine are commissioned one after the other. At the end of the commissioning the machine is ready for production and is handed over.

The commissioning comprises:

- Commissioning by Sussman service technicians

- Training at the machine

- The following services are rendered

- Run up of the machine components

- Testing of all functions of the machine components

- Start of a fully automatic molding process

- Execution of machine acceptance

Delivery extent does not comprise of:

- Raw materials, process materials and consumables

- Raw material for test blocks

- Transport and lifting devices

The operators of the plant should be present during the commissioning in order to become familiar with the new machines.


E. Our After-Sales Service Commitments


Sussman hereby solemnly promises: We implement the “three guarantees” service policy for any equipments sold by Sussman, provide free of charge installation guidelines, commissioning and maintenance of the equipments, training of the Buyer’s relevant Operators; and provide technical requirements for the installation and operation of the equipments, technical layout diagrams and other related information, provide a lifetime supply of maintenance and spare parts

The detailed measures are as follows:


1. Guidelines for installation and commissioning of equipments:

Based on the actual situation, to assist and guide the Buyer and Buyer’s technical personnel in the overall installation location, the installation of equipments, and provide Buyer with answers to their questions and related issues;

2. Provide training for operation and maintenance personnel:

Based on the Buyer’s request, Sussman will provide free of charge training of the operation and maintenance personnel;

a) The User (Buyer) can send their operation and maintenance personnel to our factory for learning and training;

b) When Sussman is doing the installation and test running of the equipments for the Buyer, the Buyer can send their personnel to participate.

3. If failure occurs in any of the machines during the “three guarantees” period(one year), then, upon the Buyer’s request, Sussman will eliminate the failure;

4. Sussman will inform all its Buyers about any upgrades and significant product improvements. Sussman will provide equipment modifications based on their costs. Sussman will provide Buyers with high-quality after-sales services in a careful and responsible attitudes, provide very strong guarantee for the Buyer’s normal production.

We provide quick and satisfactory customer service, and promise to respond within 24 hours after receiving your complaints by phone or email.


F. Commercial conditions

  • Payment terms:

40 % deposit, then T/T 60% after the inspection of the equipments by the Buyer or the Buyer’s representative at the Seller’s factory, but before shipment;


  • Delivery time: 90 days after received the payment

2. Warranty Period:

12 months warranty period, starting from the date of the successful installation and commissioning of the equipments at the Buyer’s Installation site.

China Steel Silo Metal Roof Roll Forming Machine Gear Box Driven On Line Crimping supplier

Steel Silo Metal Roof Roll Forming Machine Gear Box Driven On Line Crimping

Inquiry Cart 0