Home /Mining Machinery /

Primary And Secondary Stone Crushing Plant / Gold Crushing Equipment

Primary And Secondary Stone Crushing Plant / Gold Crushing Equipment

Brand Name:Lipu
Certification:ISO9001:2008,CE,IQNet
Model Number:According to customer
Minimum Order Quantity:1set
Delivery Time:15-20 days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Active Member
Location: Zhengzhou Henan China
Address: 6# Xueyuan Road, Mazhai Industrial Zone, Erqi District, Zhengzhou, Henan, China.
Supplier`s last login times: within 27 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Primary And Secondary Stone Crushing Plant / Gold Crushing Equipment

Professional manufacturer of LIPU provide first-class stone crusher plant and mobile stone crusher plant

for sale. We provide types of crushers for ores crushing and stone crushing process that contains primary

crushers, secondary crusher and tertiary crushing, the most widely used crusher machines are jaw

crusher, impact crusher, cone crusher and vertical shaft impact crusher, in addition, mobile crushing plant

is the portable crusher equipment for mining process of stone crushing that brings many conveniences to

customers.

Process Flows of Stone Crusher Plant

Stone crushing plant process generally divided into two section process flow and three sections process

flow. Of course, when a big scale of dressing plant, undressed ore block is very big also, in order to

reduce paragraphs crushing ratio, or to get more fine equipment granularity, also can use four part

process flow.

Two Process Flow of Stone Crusher Plant

Two paragraphs crushing process: two paragraphs process is divided into two sections: two paragraphs

opened-circuit and two paragraphs closed-circuit. Two segments of the closed-circuit paragraph in

secondary crushing machines and screening equipment into closed-circuit, this can ensure that

equipment size meets the requirement, and not influence next grinding operations.

Two sections of flow only suitable for mining technology of small mining equipment, its total crushing ratio

is not big, generally in 15-25. If the undressed ore block is less than 300mm, it needs not to first crush

after the first screening get 75-0mm, only 300-75mm must be sent to crushing equipment. Then the

stones of the first screened and the first crushed into secondary crushing together (Sieve hole for 15mm),

and get the 15-0mm stones are the finally ore size and the qualified granularity. More than 15m

unqualified equipment continued to broken, until the granularity comply with requirements.

Two paragraphs opened-circuit are not very widely used, they are only applied in some heavy mining

equipment of stone crushing plant, where received materials are carried into roller grinding mill. Besides,

mostly stone crushing plants apply two paragraphs closed-circuit plant.

Three Process Flow of Stone Crushing Plant

Three paragraphs crushing process is also divided into two sections: Three paragraphs opened-circuit

and three paragraphs closed-circuit. Before the third crushing process materials can be prescreened, but

also need not prescreening in the first crushing and secondary crushing process. Three paragraphs

opened-circuit plant general is rarely used, because it cannot guarantee the requirement of the ultimate

size. Three paragraphs closed-circuit, that means in the third paragraph of the plant, this is the most

common process. It's suitable for large, medium and small dressing plant; it has a fairly large crushing

ratio which can reach 25-200, the biggest feed size can reach about 1000mm, and the minimum row grain-

size can be reached 12mm or more fine.

Normal Configuration of Stone Crusher Plant

40 -60 TPH

Hopper + vibrating feeder + jaw crusher (PE-500×750) + impact crusher (PF-1010) or cone crusher (HPC

160) + vibrating screen

80 - 120 TPH

Hopper + vibrating feeder + jaw crusher (PE-600×900) + impact crusher (PF-1214) or cone crusher (CS 4

1/4) + vibrating screen

150 - 200 TPH

Hopper + vibrating feeder + jaw crusher (PE-750×1060) + impact crusher (PF-1315) or cone crusher

(HPC 220) + vibrating screen

250 - 300 TPH

Hopper + vibrating feeder + jaw crusher (PE-500×750) + two impact crushers (PF-11315) or cone crusher

(HPC 220) + vibrating screen

Case:

Algeria 200TPH Stone Crushing Plant

Date : June 2010

Location : Algeria

Material: Granite

Max. diameter: 450mm

Moh’s hardness: 6-7

Designing production: 200TPH

Working hours: 10 hours per day

Processing flow and equipment:

Primary crushing, secondary crushing, screening.

Product size: 3/8”, 1/2”, 3/4”

ProductEquipment ModelQtyCavity Type/Screen LayersOutlet Size/ Screen Mesh SizePower
FeedingGZD 1200*4900115kw
Primary CrushingPE 750*10601140110kw
Secondary CrushingCS Series 4 1/4”1Std Coarse18155kw
Screening3YK1860139 mm30kw