Add to Cart
Full Automatic Galvanized Corrugated Roof Tiles Making Machine k
Span CE
Applications:
Floor deck is a lightweight decking system, for car pack
construction, comprising steel profile,
top - reinforced by concrete. Floor deck roll forming machine is
the essential manufacturer of its production
Competitive Advantage:
1. CE, ISO,SGS certificates
2. professional production
3. powerful workshop
4. competitive price
5. responsible service
Specifications
NO. | ITEM | PARAMETER | NOTE | |
1. | Suitable | Type | Galvanized sheet | |
Width(mm) | 1000mm | |||
Thickness(mm) | 0.5-1mm | |||
Yield stress(mm) | G220-G300 | |||
2. | Product | Detail as the attached file | ||
Length | Any length | |||
3. | Power | Type | 220v/380v/3ph/50hz | |
Main Motor power | 11kw+11KW | |||
Cutter power | 5.5kw | |||
4. | Forming speed(m/min) | 8-15 | Not include the time of cutting | |
5. | Manual Decoiler | Type | Manual | |
Max capacity | 5t | |||
Suitable coil OD(MM) | 1000 | |||
Suitable coil | 508 | |||
6. | Forming stand | 22 | Depend on actual design | |
7. | Thickness of structure | 20mm A3 steel plate | ||
8. | Forming shaft diameter(mm) | 85 #45 steel | ||
9. | Type of cutting | Roll formed and | ||
10. | Control system | PLC and inverter | Panasonic brand | |
11. | Install dimension(depend on the final design) | 15.2m×1.5m×1.55m | Without panel length | |
12. | Total weight (Approx) | 10T | Depend on final design |
Description:
A. We will arrange engineers to supervise installation and make
adjustment for the equipment;
Buyer should pay $50 for each engineer every day. The buyer should
be responsible for transportation
(including round-trip ticket), insurance, accommodation.
B. Guarantee period:
1. The warranty will be maintenance, maintain in the guarantee
period of one year starting from delivery.
Because of the quality of equipment during guarantee period, we
will provide the parts free of charges,
which is in the conditions of correct operation. (Natural disasters
or factors which can’t forced by human
are excluded).
2. If the equipment are out of work in the guarantee period, the
buyer needs our repairman to come to
buyer’s factory, the buyer should be responsible for the
tickets(including round-trip ticket), the fee of
transportation to the buyer’s factory and the fee of accommodation.
Required to change spare parts,
the buyer should afford the freight fee and we don’t ask extra fee.
C. Detail Engineering
1. Lay out and general arrangement drawing
2. Funation lay out drawing
3. eration and maintenance instructions
D. Training
During installation and adjustment of the equipment, our engineers
shall provide the training to buyer’s
personnel to operate and maintain the equipment. Additional trading
can be provided on request.
1. Foundation construction, electrical works, and civil
engineering;
2. Electrical wire, mechanical tubes, water tubes between machines;
3. Lubricating oil, recirculation oil, gear box oil, recirculation
cooling water;
4. Safety equipments and non-standard safety items;
5. Testing material;
6. Engineering service required at the buyer’s site.
.