Home /Other Computer Products /

75 Ton Steel Mill Slag Transport Rail Operated Ladle Transfer Vehicle With V-Groove Deck

75 Ton Steel Mill Slag Transport Rail Operated Ladle Transfer Vehicle With V-Groove Deck

Brand Name:Topleader
Certification:CE,ISO9001
Model Number:KPD-Ladle Transfer Car
Minimum Order Quantity:1 set
Delivery Time:30-40 days after receive your prepayment
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Site Member
Location: Xinxiang Henan China
Address: Yudong developing zone, Yanjin County, Xinxiang City, Henan, China
Supplier`s last login times: within 31 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

75 Ton Steel Mill Slag Transport Rail Operated Ladle Transfer Vehicle With V-Groove Deck

Brief Introduction


The rail operated ladle transfer vehicle is an electric operated material transfer cart which is powered by conductor rail and running on the rails. This transfer vehicle is designed to transfer hot ladle with an external temperature up to 350° C: it has a suitable protection for engines and it is painted with an heat resistant paint

As the rail operated ladle transfer vehicles are equipped with steel wheels and move on steel rails they are suited to very high loading capacities thanks to the very low friction between steel and steel. The capacity load can up to 500 tons.



Working Principle


The kinds of rail operated ladle transfer vehicle, which is powered by conductor rails. It makes the AC electricity power is transformed into AC 36v two-phase and are respectively connected to the two rails. Then the rail operated ladle transfer vehicle conduct the AC 36v on rail into the electrical appliance box at the bottom of the vehicle. And then the AC 36v is transformed into DC 36v to control the DC motor. Use this principle to make the ladle transfer vehicle start, stop, go forward and backward, adjust the speed and so on.



Product Features


1. High quality reducer, gears adopt CNC grinding technology, high precision, good contact, high transmission efficiency, high bearing capacity and long service life.

2. High quality motor, with a correspondingly fast, large starting torque, from zero speed to rated speed with rated torque performance.

3. The wheel adopts angular bearing seat for easy installation and adjustment, in order to properly improve the machining accuracy of the relevant parts to improve the accuracy of the vehicle's installation and manufacturing, to place the wheel deviation, the contact between the rim and the track intensifies the rim wear and increases the frictional resistance and so on.

4. High degree of automation, to achieve unmanned automated production processes.



Parameter List


Model
KPD-5TKPD-20TKPD-30TKPD-40TKPD-50TKPD-63T
Rated load (T)52030405063
Table sizelength(L)350040004500500055005600
Width(W)200022002200250025002500
Height(H)450550600650650750
Wheel Base (mm)250028003200380042004300
Rail Inner Gauge (mm)143514351435143514351435
Wheel Diameter(mm)Φ300Φ350Φ400Φ500Φ500Φ600
Wheel Quantity(Nos)444444
Ground Clearance (mm)505050505075
Running speed (m/min)0-250-200-200-200-200-20
Motor Power (Kw)1.22.23.5456.3
Transformer Power (KVA)56.810101020
Transformer Quantity (Pcs)111111
Running Distance (m)808080605050
Max Wheel Load (KN)25.877.7110.4142.8174221.4
Reference Weight (T)3.65.96.87.6810.8
Recommended Rail ModelP18P24P38P43P43P50

Advantages


Safe and environment friendly

Big starting power

Small impact to the gear reducer

Can running on s-shape rail, arc-shape rails

Has no limit on working distance

Anti-explosion, anti-high temperature

Long lifetime.



Production Process


CNC Cutting

Transport the steel plate from raw material warehouse to CNC cutting workshop for cutting. After the cutting, the workers will do some simple processing such as chip moving and setting out.

Preliminary Assembling

Put the cut steel plate together according to the design drawing

Welding
Weld the steel plate with automatic welding machine after the preliminary assembling
Post weld treatment
Test the welding section after the welding, polish and burring. Post weld treatment to eliminate welding stress
Spray Primer
Transport the structure part after processing to painting booth for spraying primer. The main component of the primer is zinc rich epoxy antirust paint. The primer is to two layers
Assembling
Assemble the structure parts after spraying primer with wheels, motors and gear box, etc.
Paint finish
Transport the assembled vehicle to painting booth, inspect the integrity of primer. After that paint the finish
Debugging
Debugging the vehicle after painting the finish with electric control system, after the debugging, the vehicle will test without load. And after the no load test, the cart will be tested with load. After the inspection, the cart will be transported to storage area.



tags:crane rail trailer,steel billet handling trailer

China 75 Ton Steel Mill Slag Transport Rail Operated Ladle Transfer Vehicle With V-Groove Deck supplier

75 Ton Steel Mill Slag Transport Rail Operated Ladle Transfer Vehicle With V-Groove Deck

Inquiry Cart 0