Home /Steel Pipes /

Cold-Drawn BS 1387 DIN 1626 Seamless ERW Steel Tube Thin Wall Pipe for Construction

Cold-Drawn BS 1387 DIN 1626 Seamless ERW Steel Tube Thin Wall Pipe for Construction

Brand Name:Wuxi Sylaith
Certification:SGS ISO ROHS
Model Number:BS 1387 DIN 1626
Minimum Order Quantity:1MT
Delivery Time:7-10 Days
Payment Terms:30%T/T in advance
Contact Now

Add to Cart

Verified Supplier
Location: Wuxi Jiangsu China
Address: 168 Qiangao Road, Liangxi District, Wuxi,China
Supplier`s last login times: within 37 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Cold-Drawn BS 1387 DIN 1626 Seamless ERW Steel Tube Thin Wall Pipe for Construction


Product Description:


The high frequency welding heat process of ERW steel tube causes the temperature distribution gradient near the edge of billet, and forms the characteristic regions such as melting zone, semi-melting zone, superheated structure, normalizing zone, incomplete normalizing zone and refiring zone. As the welding temperature in the superheated zone is above 1000℃, the austenite grains grow rapidly and form hard and brittle coarse crystal phase under cooling condition. In addition, the existence of temperature gradient will produce welding stress.


SizeThickness 0.5-80mm
OD: 10-2620 mm
Length:common length 5.8m,6m,11.8m,12m or as request
StandardBS,ASTM,DIN,GB,JIS
GradeQ195,Q235,Q345,A36,SS400,ST37-2,ect
PackingBundle/In bulk/Bags/As clients' requirements
UsageBe used in structure,accessorize and construction,ect
Delivrey lead time7-15 working days after received deposit

Surface treatment


1.Bared
2.black painted (varnish coating)
3.Galvanized
4.Oiled
5.PE,3PE,FBE,corrosion resistant coating ,anti corrosion coating

Payment term


1.100% irrevocable L/C at sight
2.30% T/T prepaid and the balance against the copy of B/L
3.30% T/T prepaid and the balance against the L/C

Delivery Condition:


The tubes shall be supplied in one of the following delivery conditions

a) Cold finished/hard (cold finished as drawn): BK;

b) Cold finished/soft (lightly cold worked): BKW

c) Annealed: GBK

d) Annealed (including de-scaling): GZF;

e) Normalized: NBK

f) Normalized (including de-scaling): NZF.

Detailed Photo:



Factroy Pictures:




Pipe & Tube Processing:




Steel Pipe & Tube Application:




Packaging and Shipping:




Certificates:



FAQ:

Q1: ARE YOU FACTORY OR TRADER?
A1: Wuxi Sylaith Special Steel Co.,Ltd is a manufacturer of steel pipe and tube since 2010.

We've gained our Export Right and become an integrated company of industry and trade in order to satisfy buyer's multi-request on different material and products.


Q2: WHICH MATERIAL/PRODUCTS YOU CAN PROVIDE?
A2: Seamless Stainless Steel Pipe / Tube, Seamless Carbon Stainless Steel Pipe /Tube,Galvanized Steel Tube witn any Shape and Welded pipes can also be available.


Q3: HOW TO GET A SAMPLE?
A3: FREE samples are available for your checking and testing. And to get free samples, you need to send us you detailed receiving address (including post code) and your DHL/FedEx/UPS account for collecting samples, courier cost will be paid in your side.


Q4: CAN YOU PRODUCE THE PRODUCTS ACCORDING TO MY OWN DRAWINGS?
A4: Yes, we can produce the products according to your drawings that will be most satisfy you.


Q5: HOW TO VISIT YOUR FACTORY?
A5: Most of the main cities have flights to Shanghai; you can take flight to Shanghai Putong/Hongqiao International Airport.
If you come from Hongkong, it will take 2 hours by flight (every day 5 flight around noon time).


China Cold-Drawn BS 1387 DIN 1626 Seamless ERW Steel Tube Thin Wall Pipe for Construction supplier

Cold-Drawn BS 1387 DIN 1626 Seamless ERW Steel Tube Thin Wall Pipe for Construction

Inquiry Cart 0